Quality Inspection (Production)
Window Introduction
Introduction
Introduction
Inspection Production window is used to Inspect the operations during producing a component,This window provide you the inspection result based on the test plan provided.
Business Example
In a pump Industry there will be Inspection during production a component called as stage inspection or process inspection.This window is used to carry the Inspection process.
Tabs
Inspection
Critical Fields
1) Name- Enter the Name of the document.
2) Tester- Name of the person who is inspecting the component.
Critical & onetime setup fields
1) Organization Field- This Field is used to select the organization which you are going to process the order.
2)Target Document Type- This Field is used to select the type of the document that you are going to process.
Non-Critical Fields
1. Description: To note Specifics required with documents and to describe other important information.
2. Reason: Reason for QC Outcome (User), being entered by user manually.
Serial number/Lot number (ASI)
Serial number can be selected from previous document.User cant create new serial number in this document.
Zoom condition’s
1) NCR
Customization
Results
Critical Fields
1) Parameter- Multiple parameters may be there for inspecting a product.This will be shown from Test Plan which the user selected for the product.
2) Record Value- The value that acquired in real during Inspecting the parameter need to be entered.
3) Total Qty- Number of quantity which are inspected.
4) Qc outcome (User)- If decision from the system need to changed this option can be used.For using this option need to configure in the test plan against the parameter.
Critical & onetime setup fields
Non-Critical Fields
Serial number/Lot number (ASI)
Zoom condition’s
Validation
Consumables
Critical Fields
1) Product- Enter or select the product that needs to be consumed.
2) UOM: Unit of Measurement of product is to be inspected.
3) Quantity- This field represents the quantity needs to be consumed additionally while inspecting.
4) Charge- For posting cost of the consumed product.
Critical & onetime setup fields
Non-Critical Fields
Serial number/Lot number (ASI)
Zoom condition’s
Validation
Quality Tools
It's use to add asset and change test plan.
Document Actions
Validations
Save
1) System will check whether all the Mandatory Fields are filled.
2) System will generate the document number.
3) System will check whether a valid quality test plan is provided.
Delete
System will delete the order and its history from the database.This can be done only when the document status is Draft status and In progress Status.
Document action prepare
1) System will check the Product,Test plan,Previoust document and convert the document status to In progress.
2) System will check the Period control for the document date whether it is open.
Document action complete
System will complete the document and keep the order ready for processing in production que and change the document status to complete.
Document action void/reverse correct actual
1) Void- system will reverse all the cost transaction data's and change the document status to Void
Document action close
1) system will check whether all the activity for the document is completed and change the Document status to close.
Actions
Verify
Create lines from
1) Manufacturing order- Select the manufacturing order number which need to be inspected.
2) Order operation- Select the operation which needs to be inspected.
3) Resource- This Field displays the resource of the selected operation.
4) Refresh- This button displays the data as per the selected criteria.
5) Clear- this button helps to clear the selected criteria.
Copy from/lines
<custom actions>
Process
Create Lines from
Create lines from process is used to create the Inspection data details like product and document numbers from the Material Receipt or Job Work Receipt or Customer Return Document Types.
Generate NCR
Generate NCR process is used to generate NON Confirmation Report for the Inspected Document.
This Process creates New NCR Document in that window.
Videos
Reports
Sr.No | Report Name | Report Purpose |
1 | Inprocess Inspection Report | This Report is used to get details about the inspection Production . |
2 | Inspection Pending Report (InProcess) | This Report Gives the Details about the Inspection Production With Pending Quantity and Activity Control Report No. |
3 | Inspection Pending Report Purchase | This Report gives the Purchase Inspection details with Pending Quantity. |
Quality Tools
It's use to add asset and change test plan.