Validations
Save
1) System will check whether all the Mandatory Fields are filled.
2) System will check the bill of material whether the bill of material is valid.
3) System will check whether the Manufacturing work flows routing is valid.
4) System will generate the document number.
Delete
System will delete the order and its history from the database.This can be done only when the document status is Draft status and In progress Status.
Document action prepare
1) System will check the Product,Bill of material,Manufacturing work flows routing,Product Planning data of the manufacturing order and convert the document status to In progress.
2) System will check the Period control for the document date whether it is open.
Document action complete
System will complete the document and keep the order ready for processing in production que and change the document status to complete.
Document action void/reverse correct actual
Document action close
1) system will check whether all the activity for the document is completed and change the Document status to close.